What is the EUDR deadline for coffee importers?
30 December 2026 if you are a medium or large operator, 30 June 2027 if you are micro or small and were established as such by 31 December 2024, per Regulation (EU) 2025/2650. (Coffee is not an EUTR timber product, so the timber exception to the later date does not apply.) Coffee is squarely in scope — beans and listed derivatives, decided by HS code — so the dates apply to importing it like anything else. The six-month gap for micro and small operators is preparation time, not a lighter duty: first filings still need plot geolocation, evidence and a risk conclusion. Green coffee’s long lead times argue for starting plot collection now.
Full answer: guide — SME deadlines explained
Indicative screening for decision-support only — not a compliance determination, certification, or legal advice. Due-diligence obligations remain with the operator (EUDR Art. 10).