Skip to content

THE EUDR CHECKLIST · OPERATOR JOURNEY

Your obligations, organized.

One checklist for the whole operator journey — eight stages, from scope to ongoing monitoring, current to the Regulation (EU) 2025/2650 amendments. This checklist doesn’t determine your compliance; it organizes the work, step by step, with the deepest page for each step.

START AT STAGE 01

PROGRESS · 0 OF 33 ITEMS

Ticks are stored on this device only. A completed checklist is organization, not compliance — the due-diligence obligations remain with the operator (EUDR Art. 10).

STAGE 01 · 0/4 DONE

Scope — establish whether the EUDR applies to you

Everything downstream depends on two answers: whether your products are listed, and what role you play. Get these wrong and you prepare for the wrong regime — or for none at all.

  • Check every product you import or export against the Annex I list, by CN/HS code

    Scope is decided code by code, not by product name — and the list has been amended twice: Regulation (EU) 2025/2650 removed printed products, and Commission Delegated Regulation (EU) 2026/2102 (in force 18 September 2026) removed leather and several rubber and soya codes while adding others from 30 December 2027 (as amended; confirm the current version).

    COMMODITY SCOPE, CODE BY CODE
  • Determine your role: operator or trader

    The first placer on the EU market (usually the importer) carries the full duty; downstream operators and traders file no DDS — they keep supplier and customer details for five years (Art. 5).

    CONFIRM YOUR ROLE — SCOPE WIZARD
  • Establish your size class and write down your application date

    Medium & large: 30 December 2026. Micro & small established as such by 31 December 2024: 30 June 2027 — except EUTR timber, pulp and paper products, which apply from 30 December 2026 whatever the size. Size follows Directive 2013/34/EU, assessed per legal entity (Regulation (EU) 2025/2650).

    WHICH DEADLINE IS YOURS?
  • Note the benchmarking class of your main origins

    Countries are classed low/standard/high risk under Implementing Regulation (EU) 2025/1093 — it shapes the depth of due diligence expected.

    HOW ORIGIN AFFECTS YOUR SCOPE

STAGE 02 · 0/5 DONE

Supplier geolocation — collect plot locations once, properly

Geolocation is the EUDR’s signature demand and the most common source of rejected filings. Collect at supplier registration, not in a panic before a shipment.

  • List every supplier and every plot behind your top products

    A shipment references all plots it draws on — the inventory is the foundation everything else sits on.

    RUN THE SCOPE WIZARD FIRST
  • Collect latitude/longitude points for plots of 4 ha or less

    WGS84 decimal degrees, at least six decimal places — e.g. 5.351234, -4.028391.

    FREE GEOMETRY VALIDATOR — GEO TOOLS
  • Collect closed polygons for plots above 4 ha

    First vertex equals last, no self-intersections. Polygons are what screening tools prefer at any size.

    GUIDE: POINTS VS POLYGONS
  • Set acceptance checks at intake: WGS84, decimal degrees, closed rings

    Three checks at intake prevent most rejection cycles later.

    VALIDATE GEOMETRY IN BULK — GEO TOOLS
  • Send collection links to suppliers instead of collecting by email

    Shareable plot-collection links let suppliers submit geometry themselves — the Collect tab in your console issues them.

    OPEN THE CONSOLE — COLLECT TAB

STAGE 03 · 0/4 DONE

Plot screening — know what the datasets say

The cut-off date of 31 December 2020 makes every plot a historical question. Screening turns that question into a documented, reproducible signal.

  • Screen every plot against deforestation datasets

    Tree-cover loss (Hansen GFC), alerts (GLAD/RADD), land-cover context — indicative, decision-support signals.

    SCREEN A PLOT FREE — SCOPE-CHECKER
  • Record the engine and Whisp versions and the analysis time with each result

    Each screening records the EUDR Clear engine version, the Whisp version and the UTC time it ran, and keeps Whisp’s raw response — that is what keeps 2026 results reviewable in 2029.

    THE DATASET STACK — METHODOLOGY
  • Investigate every plot with an elevated signal before moving on

    A signal is a prompt to look, not a verdict — resolve it with documents, imagery, or supplier answers.

    HOW SIGNALS ARE READ — METHODOLOGY
  • Re-screen when datasets update materially; keep the old results

    Monitoring datasets improve; your record should show both what you knew and when.

    HOW RECORDS STAY REPRODUCIBLE — TRUST CENTER

STAGE 04 · 0/4 DONE

Risk assessment — reach a documented conclusion

Due diligence is a judgment you document, not a feeling. The DDS states a conclusion; this stage is where you earn the right to state it.

  • Assemble per-plot evidence: geolocation, screening outputs, supplier documents

    Everything a reviewer would ask about one plot, in one place.

    SEE A SAMPLE EVIDENCE PACK (DEMO)
  • Assess legality of production and land-use rights signals

    Article 3 requires production in line with the legislation of the country of production — documents matter here, not just satellites.

    THE THREE ARTICLE 3 CONDITIONS — GLOSSARY
  • Write down your risk conclusion per consignment

    “Negligible risk” is a documented judgment on the evidence — and it remains yours, whoever’s tools you used.

    GUIDE: WHAT A DDS MUST CONTAIN
  • Where risk is not negligible, mitigate and record what changed

    Additional supplier documents, corrective action, or stepping away from the plot — then re-assess.

    TRUST CENTER — HOW WE SUPPORT, NOT DECIDE

STAGE 05 · 0/4 DONE

DDS preparation — assemble before you file

Most DDS panic is retrieval panic. The facts existed somewhere; assembling them per shipment was the pain. Preparation makes filing boring — which is the goal.

  • Map each product to its HS/CN code, description and quantity

    These fields go straight into the DDS — mismatches with customs paperwork surface here.

    COMMODITY CODE REFERENCES
  • Attach plot geolocation and screening evidence for the shipment

    One shipment can draw on many plots — all of them belong in the pack.

    GUIDE: WHAT GOES IN A DDS
  • Assemble the evidence pack: geometries, results, versions, timestamps

    Sealed by custody hash and exportable — the Packs tab builds these from your screened plots.

    OPEN THE CONSOLE — PACKS TAB
  • Assign who reviews and who signs the DDS

    A named reviewer and a named signatory — the conclusion is the operator’s, and someone owns it.

    RECORD-KEEPING POSTURE — TRUST CENTER

STAGE 06 · 0/4 DONE

TRACES submission — file, capture, attach

The DDS is filed through TRACES NT before market access or export. Format problems — not substance — cause most rejections, and they are all fixable before you file.

  • Register for TRACES NT access and confirm who files

    EU Login credentials and a filing owner inside the company — before the first shipment needs them.

    GUIDE: WHERE TRACES FITS
  • Validate geolocation format before upload

    Six-plus decimals, closed rings, GeoJSON, lat/lon in the right order — the seven usual rejection causes, pre-checked.

    THE 7 REJECTION CAUSES & FIXES
  • File the DDS and capture the reference number

    The reference number links your shipment to its due diligence — no reference, no market access for covered goods.

    GUIDE: FILING & REFERENCE NUMBERS
  • Attach the DDS reference to consignment and customs paperwork

    The number travels with the shipment; make the linkage explicit in your records.

    WHAT WE DO AND DON’T DO — TRUST CENTER

STAGE 07 · 0/4 DONE

Record keeping — five years, retrievable

The EUDR requires operators to keep the information supporting due diligence for five years, and competent authorities can request it. An unfindable record is a missing record.

  • Store each DDS with its evidence for five years

    Geolocation, screening outputs, supplier documents, risk conclusion — together, not scattered.

    FIVE YEARS, SEALED BY CUSTODY HASH — TRUST CENTER
  • Keep the engine and Whisp versions with each stored result

    A 2026 figure must read the same when reviewed in 2029 — the recorded versions, analysis time and raw response are what make it reproducible.

    ENGINE VERSION RECORD, EXPLAINED
  • Give third parties a way to check your records are untampered

    Custody hashes let a reviewer confirm the stored record behind a pack has not changed since it was screened.

    VERIFY A RECORD BY HASH
  • Know what a competent-authority check can ask for

    Checks under the regulation reach the DDS, the evidence behind it, and the system that produced it.

    OUR LEGAL POSITION — TRUST CENTER

STAGE 08 · 0/4 DONE

Ongoing monitoring — the checklist never really ends

Obligations continue after the first filing: plots change, datasets improve, sourcing shifts. Monitoring is what keeps a filed DDS true.

  • Monitor screened plots between shipments

    Monitored plots (Growth and Scale plans) are re-screened once every 24 hours; the Alerts tab flags verdict changes and loss movements of 0.5 ha or more on your plots.

    OPEN THE CONSOLE — ALERTS TAB
  • Track dataset updates and re-screen on material changes

    Upstream datasets evolve; re-screening on material changes keeps your record current.

    DATASET STACK — METHODOLOGY
  • Update the supplier and plot inventory as sourcing changes

    New origin, new plot, new supplier — each enters the same pipeline as stage one.

    RE-RUN THE SCOPE WIZARD
  • Watch for regulation and benchmarking updates

    Amendments have already moved dates and adjusted the product list — assume change continues.

    CHANGES & DEADLINES — FAQ

FINISHED ALL EIGHT STAGES?

Then your obligations are organized — which was the goal. The judgment itself stays with you: run the scope-checker on your first plot, assemble the evidence pack, and keep monitoring. If a term above was new, the glossary defines every one of them plainly.

Indicative screening for decision-support only — not a compliance determination, certification, or legal advice. Due-diligence obligations remain with the operator (EUDR Art. 10).

STAGE 03, MADE CHEAP

The checklist starts with scope. Scope starts with one plot.

Two minutes, one plot, instant demo-engine screening — free.

Check your scope — free

Indicative screening for decision-support only — not a compliance determination.