THE EUDR CHECKLIST · OPERATOR JOURNEY
Your obligations, organized.
One checklist for the whole operator journey — eight stages, from scope to ongoing monitoring, current to the Regulation (EU) 2025/2650 amendments. This checklist doesn’t determine your compliance; it organizes the work, step by step, with the deepest page for each step.
PROGRESS · 0 OF 33 ITEMS
Ticks are stored on this device only. A completed checklist is organization, not compliance — the due-diligence obligations remain with the operator (EUDR Art. 10).
STAGE 01 · 0/4 DONE
Scope — establish whether the EUDR applies to you
Everything downstream depends on two answers: whether your products are listed, and what role you play. Get these wrong and you prepare for the wrong regime — or for none at all.
Check every product you import or export against the Annex I list, by CN/HS code
Scope is decided code by code, not by product name — and the list has been amended twice: Regulation (EU) 2025/2650 removed printed products, and Commission Delegated Regulation (EU) 2026/2102 (in force 18 September 2026) removed leather and several rubber and soya codes while adding others from 30 December 2027 (as amended; confirm the current version).
COMMODITY SCOPE, CODE BY CODEDetermine your role: operator or trader
The first placer on the EU market (usually the importer) carries the full duty; downstream operators and traders file no DDS — they keep supplier and customer details for five years (Art. 5).
CONFIRM YOUR ROLE — SCOPE WIZARDEstablish your size class and write down your application date
Medium & large: 30 December 2026. Micro & small established as such by 31 December 2024: 30 June 2027 — except EUTR timber, pulp and paper products, which apply from 30 December 2026 whatever the size. Size follows Directive 2013/34/EU, assessed per legal entity (Regulation (EU) 2025/2650).
WHICH DEADLINE IS YOURS?Note the benchmarking class of your main origins
Countries are classed low/standard/high risk under Implementing Regulation (EU) 2025/1093 — it shapes the depth of due diligence expected.
HOW ORIGIN AFFECTS YOUR SCOPE
STAGE 02 · 0/5 DONE
Supplier geolocation — collect plot locations once, properly
Geolocation is the EUDR’s signature demand and the most common source of rejected filings. Collect at supplier registration, not in a panic before a shipment.
List every supplier and every plot behind your top products
A shipment references all plots it draws on — the inventory is the foundation everything else sits on.
RUN THE SCOPE WIZARD FIRSTCollect latitude/longitude points for plots of 4 ha or less
WGS84 decimal degrees, at least six decimal places — e.g. 5.351234, -4.028391.
FREE GEOMETRY VALIDATOR — GEO TOOLSCollect closed polygons for plots above 4 ha
First vertex equals last, no self-intersections. Polygons are what screening tools prefer at any size.
GUIDE: POINTS VS POLYGONSSet acceptance checks at intake: WGS84, decimal degrees, closed rings
Three checks at intake prevent most rejection cycles later.
VALIDATE GEOMETRY IN BULK — GEO TOOLSSend collection links to suppliers instead of collecting by email
Shareable plot-collection links let suppliers submit geometry themselves — the Collect tab in your console issues them.
OPEN THE CONSOLE — COLLECT TAB
STAGE 03 · 0/4 DONE
Plot screening — know what the datasets say
The cut-off date of 31 December 2020 makes every plot a historical question. Screening turns that question into a documented, reproducible signal.
Screen every plot against deforestation datasets
Tree-cover loss (Hansen GFC), alerts (GLAD/RADD), land-cover context — indicative, decision-support signals.
SCREEN A PLOT FREE — SCOPE-CHECKERRecord the engine and Whisp versions and the analysis time with each result
Each screening records the EUDR Clear engine version, the Whisp version and the UTC time it ran, and keeps Whisp’s raw response — that is what keeps 2026 results reviewable in 2029.
THE DATASET STACK — METHODOLOGYInvestigate every plot with an elevated signal before moving on
A signal is a prompt to look, not a verdict — resolve it with documents, imagery, or supplier answers.
HOW SIGNALS ARE READ — METHODOLOGYRe-screen when datasets update materially; keep the old results
Monitoring datasets improve; your record should show both what you knew and when.
HOW RECORDS STAY REPRODUCIBLE — TRUST CENTER
STAGE 04 · 0/4 DONE
Risk assessment — reach a documented conclusion
Due diligence is a judgment you document, not a feeling. The DDS states a conclusion; this stage is where you earn the right to state it.
Assemble per-plot evidence: geolocation, screening outputs, supplier documents
Everything a reviewer would ask about one plot, in one place.
SEE A SAMPLE EVIDENCE PACK (DEMO)Assess legality of production and land-use rights signals
Article 3 requires production in line with the legislation of the country of production — documents matter here, not just satellites.
THE THREE ARTICLE 3 CONDITIONS — GLOSSARYWrite down your risk conclusion per consignment
“Negligible risk” is a documented judgment on the evidence — and it remains yours, whoever’s tools you used.
GUIDE: WHAT A DDS MUST CONTAINWhere risk is not negligible, mitigate and record what changed
Additional supplier documents, corrective action, or stepping away from the plot — then re-assess.
TRUST CENTER — HOW WE SUPPORT, NOT DECIDE
STAGE 05 · 0/4 DONE
DDS preparation — assemble before you file
Most DDS panic is retrieval panic. The facts existed somewhere; assembling them per shipment was the pain. Preparation makes filing boring — which is the goal.
Map each product to its HS/CN code, description and quantity
These fields go straight into the DDS — mismatches with customs paperwork surface here.
COMMODITY CODE REFERENCESAttach plot geolocation and screening evidence for the shipment
One shipment can draw on many plots — all of them belong in the pack.
GUIDE: WHAT GOES IN A DDSAssemble the evidence pack: geometries, results, versions, timestamps
Sealed by custody hash and exportable — the Packs tab builds these from your screened plots.
OPEN THE CONSOLE — PACKS TABAssign who reviews and who signs the DDS
A named reviewer and a named signatory — the conclusion is the operator’s, and someone owns it.
RECORD-KEEPING POSTURE — TRUST CENTER
STAGE 06 · 0/4 DONE
TRACES submission — file, capture, attach
The DDS is filed through TRACES NT before market access or export. Format problems — not substance — cause most rejections, and they are all fixable before you file.
Register for TRACES NT access and confirm who files
EU Login credentials and a filing owner inside the company — before the first shipment needs them.
GUIDE: WHERE TRACES FITSValidate geolocation format before upload
Six-plus decimals, closed rings, GeoJSON, lat/lon in the right order — the seven usual rejection causes, pre-checked.
THE 7 REJECTION CAUSES & FIXESFile the DDS and capture the reference number
The reference number links your shipment to its due diligence — no reference, no market access for covered goods.
GUIDE: FILING & REFERENCE NUMBERSAttach the DDS reference to consignment and customs paperwork
The number travels with the shipment; make the linkage explicit in your records.
WHAT WE DO AND DON’T DO — TRUST CENTER
STAGE 07 · 0/4 DONE
Record keeping — five years, retrievable
The EUDR requires operators to keep the information supporting due diligence for five years, and competent authorities can request it. An unfindable record is a missing record.
Store each DDS with its evidence for five years
Geolocation, screening outputs, supplier documents, risk conclusion — together, not scattered.
FIVE YEARS, SEALED BY CUSTODY HASH — TRUST CENTERKeep the engine and Whisp versions with each stored result
A 2026 figure must read the same when reviewed in 2029 — the recorded versions, analysis time and raw response are what make it reproducible.
ENGINE VERSION RECORD, EXPLAINEDGive third parties a way to check your records are untampered
Custody hashes let a reviewer confirm the stored record behind a pack has not changed since it was screened.
VERIFY A RECORD BY HASHKnow what a competent-authority check can ask for
Checks under the regulation reach the DDS, the evidence behind it, and the system that produced it.
OUR LEGAL POSITION — TRUST CENTER
STAGE 08 · 0/4 DONE
Ongoing monitoring — the checklist never really ends
Obligations continue after the first filing: plots change, datasets improve, sourcing shifts. Monitoring is what keeps a filed DDS true.
Monitor screened plots between shipments
Monitored plots (Growth and Scale plans) are re-screened once every 24 hours; the Alerts tab flags verdict changes and loss movements of 0.5 ha or more on your plots.
OPEN THE CONSOLE — ALERTS TABTrack dataset updates and re-screen on material changes
Upstream datasets evolve; re-screening on material changes keeps your record current.
DATASET STACK — METHODOLOGYUpdate the supplier and plot inventory as sourcing changes
New origin, new plot, new supplier — each enters the same pipeline as stage one.
RE-RUN THE SCOPE WIZARDWatch for regulation and benchmarking updates
Amendments have already moved dates and adjusted the product list — assume change continues.
CHANGES & DEADLINES — FAQ
FINISHED ALL EIGHT STAGES?
Then your obligations are organized — which was the goal. The judgment itself stays with you: run the scope-checker on your first plot, assemble the evidence pack, and keep monitoring. If a term above was new, the glossary defines every one of them plainly.
Indicative screening for decision-support only — not a compliance determination, certification, or legal advice. Due-diligence obligations remain with the operator (EUDR Art. 10).
STAGE 03, MADE CHEAP
The checklist starts with scope. Scope starts with one plot.
Two minutes, one plot, instant demo-engine screening — free.
Check your scope — freeIndicative screening for decision-support only — not a compliance determination.