Regulation (EU) 2025/2650 in one paragraph#

The EUDR originally applied from 30 December 2024 (large operators) / 30 June 2025 (micro and small). Application was postponed twice, twelve months each time: Regulation (EU) 2024/3234 (December 2024), then Regulation (EU) 2025/2650 (December 2025) — 24 months in total, landing on 30 December 2026 for medium and large operators and 30 June 2027 for micro and small established as such by 31 December 2024. 2025/2650 also deleted printed products from Annex I, and Commission Delegated Regulation (EU) 2026/2102 (in force 18 September 2026) adjusted the product list further (as amended — confirm the current Annex I).

Which size class are you#

Size follows Article 3 of Directive 2013/34/EU (thresholds as amended by Delegated Directive (EU) 2023/2775), and the test is 2-of-3: an undertaking is micro, small or medium if it does not exceed at least two of balance sheet (micro €450k / small €5m / medium €25m), net turnover (€900k / €10m / €50m) and average employees (10 / 50 / 250). For the EUDR deadlines, you fall in the “micro & small” or “medium & large” bucket against those ceilings.

The test is assessed per legal entity — not across linked and partner undertakings (Commission FAQ §3.13) — and your micro/small status for the later date is judged as at 31 December 2024. Counsel should confirm the thresholds for your case.

What changes for micro & small#

The headline is time: 30 June 2027 instead of 30 December 2026, per Regulation (EU) 2025/2650 — for operators established as micro or small by 31 December 2024, and not for EUTR timber, pulp and paper products, which apply from 30 December 2026 whatever the size. For everyone outside Article 4a, nothing is waived but time: geolocation and the DDS itself still apply.

In practice the six-month gap is for preparation, not relaxation: your first filings still need plots, evidence, and a risk conclusion.

The Art. 4a simplified declaration#

A micro or small primary operator — a natural person or micro or small undertaking established in a low-risk country, placing on the market or exporting what it grew, harvested or raised itself (Art. 2(15a)) — files no due diligence statement (Art. 4a(1)). It submits a one-time simplified declaration in the EUDR information system and is assigned a declaration identifier (Art. 4a(2)). Where a national database already holds the Annex III information, no declaration is needed, but the identifier must still be assigned before the products are placed on the market (Art. 4a(4)). A postal address may replace plot geolocation (Art. 4a(5)). Every EU member state is low risk under Implementing Regulation (EU) 2025/1093.

If you do not meet every condition — natural person or micro/small undertaking, established in a low-risk country, placing your own production on the market — Article 4a does not apply and the full DDS route is yours.

A 12-month preparation countdown#

Working back from 30 June 2027: by mid-spring 2027, run your first full DDS rehearsal on a real shipment; by early 2027, geolocation collected for your top suppliers; by late 2026, supplier engagement and scope confirmation done. Start now with a plot inventory and one screened plot.

Sequence matters less than starting: a screened plot today becomes a rehearsed DDS later. Free tools make the first step cheap.

“Deadlines are for filing — preparation is for the months before.”

Your next step#

The deadline page keeps a live countdown, a milestone timeline, and a preparation checklist. Work through it in order and the deadline becomes a date, not a threat.

TRY IT